QUALITY PLAN AND QUALITY AUDIT

 Sample Quality Plan and Quality Audit for a Building

To Download the formats, Click (Download).

Sample Quality Plan                                                                                         (Download)

S.No.

ITEM

VERIFICATION/ INSPECTION ACTIVITY

REMARKS

1

Steel

Delivery challan, Material Transfer Order, Test Certificate (Depending on the purchase order), Lab reports.

Only when asked for.

2

Cement

Delivery challan, Material Transfer Order, Lab reports for fineness, hardness, grade sizes, final and initial setting time.

Only when asked for.

3

Sand

Sieve analysis, Silt content

After initial sample is approved, a random check will be done

4

Jelly

Sieve analysis

After initial sample is approved, a random check will be done

5

Concrete Blocks

Lab reports for compression strength

 

6

Lime

Fineness

 

7

Marble

Visual inspection for grains, whiteness and cracks

As per the sample available

8

Granite

Check for quality, colour and cracks

As per the sample

9

Tiles

Size variation and visual inspection for damages

As per the sample

10

Teakwood

Check for seasoning, cracks and fungus

 

11

Flush Doors

Check for size, waterproofing, thickness and damages

 

12

Aluminium

Check for colour variation and section sizes

 

13

Paint

Check for the coverage and finishing

 

14

Renovo

Check for the colour variation and coverage

 

15

Electrical fitting

Check for the Make, Colour & Functioning

As per the samples available

16

Sanitary fitting

Check for the make, colour & damages

 

17

C P Fitting

Check for the Make

As per the sample

18

Hardware fittings

Check for the Make and the Colour

As per the sample

19

Fabrication

Check for the specifications

As per the sample


Sample Quality Audit                                                                                                   (Download)

S.No

Description

Yes

No

NA

Remarks

1

Whether QA plan being kept at site

 

 

 

 

2

Whether Quality Check list being Followed at Site

 

 

 

 

3

Whether the NCR given by PMC being closed within 48hrs

 

 

 

 

4

Whether contractor has appointed Qualified Quality Person

 

 

 

 

5

Whether the Concrete Pour card being signed by consultants, PMC & Project in charge

 

 

 

 

6

Whether the Latest / revised Drawings being used at site

 

 

 

 

7

Is the old drawings are superseded & properly Documented / Returned back to PMC

 

 

 

 

8

Whether the Cement has Stored Properly in Godown

 

 

 

 

9

Whether Steel has properly stacked in steel yard

 

 

 

 

10

Whether Other A class Materials are Properly Stored

 

 

 

 

11

Whether the Material are being tested before they use

 

 

 

 

12

Whether the Material Test reports being documented & certified by Project In charge/PMC In charge

 

 

 

 

13

Whether the Cubes are casted, tested, audited & documented properly.

 

 

 

 

14

Whether the Mix design being approved by consultant

 

 

 

 

15

Whether the sample cubes being casted & tested as per approved mix design

 

 

 

 

16

Whether the concrete being poured in presence of PMC in charge

 

 

 

 

17

Whether the contractor has deployed Qualified safety officer

 

 

 

 

18

Whether the contractor has safety Manual, Is being implemented at site

 

 

 

 

19

Whether Labors & Staffs are Using the Safety Equipments

 

 

 

 

20

Whether Hazardous area being properly barricaded /Closed.

 

 

 

 

21

Whether Safety Signage Boards being displayed at site

 

 

 

 

22

Whether Safety Training to Staff & Labors being given.

 

 

 

 

23

Whether Safety Nets being used in slab.

 

 

 

 

24

Whether the contractor has maintained the work place & site of clean & neat

 

 

 

 

25

Whether all the joints being treated properly before continuation

 

 

 

 

26

Whether all the materials being used as per contract specification

 

 

 

 